The enusite is taking shape and we love it. The top image is taken from the louvered windows in the shower. The plumbing is and connected. At the beginning Craft estimated a six week build to finish the roof over the deck, ensuite and carport. Craft have approximately two weeks to go, to finish this section.
No comments:
Post a Comment