Build Day 6: Roof over Existing Deck and Ensuite

The roof over the existing deck is taking shape. The balaustrade and older posts are gone. The power cable is nailed to the front of the facia board, I just hope that a strong wind doesn't take out the power.
The entire wall of the old lounge room has been removed. In the midde of the picture you'll notice the cavity sliding door. However the most exciting element is that the sun can be seen coming through the top part of the clerestory window! The shot was taken at 0611 this morning.